The start of the range of items (materials) that must be checked.
Check Use-up Material Definitions (tibom0251m000)Use this session to check the materials in BOMs to see if a material is outdated and must be replaced by another material.
Item From The start of the range of items (materials) that must be checked. Item To The end of the range of items (materials) that must be checked. Shop Floor Planner The person responsible for printing, (re)scheduling and releasing production orders and managing workloads.
Check Starts checking the materials.
| |||