The cost-price surcharge expressed as a fixed amount can be
positive or negative. In the latter case, it is in effect an Item Surcharge Base (ticpr1120m000) discount.
% of Total Costs
The cost-price surcharge is a percentage of the total costs as
included in the cost-price calculation.
Note
LN does
not include cost-price surcharges that must be calculated in the surcharge on
the total costs, because they are not known at that moment. The surcharge
percentage can be positive or negative. In the latter case, it is in effect a
discount.
% of Added Costs
This method is similar to the of Total Costs method, except that a surcharge is now only applied to the added costs that are known thus far. Added costs are
direct operation costs at the highest level in the product structure, and
cost-price surcharges. In this way, you can avoid that surcharges are applied
to surcharges, which is mainly relevant for manufactured parts with a
multilevel product structure.
% Selective (Total Costs)
This method is similar to the of Total Costs method. However, the surcharge basis is not the total cost
price, but a selection of the item's total cost-price structure. Run the Item Surcharge Base (ticpr1120m000) session to specify the cost component(s) to which the
surcharge must be applied.
% Selective (Added Costs)
This surcharge method is similar to the of Total Costs method, in which the surcharge basis is not the total cost price
for the selected cost components, but only the added costs for the cost
components. Refer to the information on the of Added Costs method.