To modify load plans using the Plan Board (fmlbd0215m000)In the Plan Board (fmlbd0215m000) session, you can make changes to the following objects:
For these objects, you can perform activities such as move, add, or delete, but you can also change the details of the object. Move object To move objects in the Loads and Shipments pane, for example, to move a shipment to another load, See Load composition - moving objects. Copy object To copy an object, select the object and select the duplicate icon on the toolbar. This option is available in each pane of the Plan Board (fmlbd0215m000) session. Change object details To change the details of an object in the Loads and Shipments pane, you must access the relevant maintenance session. For example, to change the details of a shipment, right-click the shipment and select Details in the context menu to start the Shipments (fmlbd3100m000) session. The options on the context menu are also available on the Specific menu. Add shipment line, shipment, or load
For example, to add a shipment to a load, right-click the load in the Loads and Shipments pane, and select Add a New Shipment on the context menu. In the Shipments (fmlbd3100m000) session, specify the required shipment data. The load data is defaulted from the selected load. After saving the new shipment in the Shipments (fmlbd3100m000) session, the shipment is displayed in the Loads and Shipments pane. Add freight order line to plan To add a freight order line to the plan displayed in the Loads and Shipments pane, drag the freight order line from the Freight Orders pane to the Loads and Shipments pane. This adds the freight order line to the plan and launches the replanning process for the freight order line. See Replan separately or include in Planned freight orders. Delete object To delete an object, click the object and select the delete icon on the toolbar. This option is available in each pane of the Plan Board (fmlbd0215m000) session. If an object is deleted, this can result in recalculation of the freight costs of the load structure from which the object is deleted. This is similar to freight cost recalculation of the originating object after an object is moved. See Load composition - moving objects. Note You can only delete load plans without loads, shipments, and shipment lines. See Load plan, load, and shipment maintenance. Remove shipment line from plan To remove a shipment line from a load plan, drag the shipment line from the Load and Shipments pane to the Freight Orders pane. Make load plan Actual To make a load plan Actual, highlight the load plan in the Plans pane and from the appropriate menu, click Actualize Plan. Calculate freight costs If you change a load plan, for example by adding or removing shipments, you can consider recalculating the freight costs for the load plan. To calculate the freight costs for a load plan, right-click the load plan and select Calculate Freight Costs on the context menu. You can also calculate the freight costs of loads, shipments, and shipment lines.
| |||