Replan separately or include in Planned freight ordersThe Replanning of Freight Orders parameter in the Freight Planning Parameters (fmlbd0100m000) session controls the way in which the changed freight order lines are replanned. In the Generate Plan (fmlbd0280m000) session, you can select the load plan in which the changed freight order lines must be included. In the Replanning of Freight Orders parameter, these options are available:
Note Some of the shipments of an Actual load plan can have obtained the In Progress status. Freight order lines that must be replanned cannot be matched with freight order lines that are related to shipments with the In Progress status. In such cases, combined planning cannot be performed.
| |||