The scenario for which LN maintains the workload control parameters.
Work Load Control Parameters (cpwlc2101m000)Use this session to maintain the parameters for the workload planning method for a specific combination of scenario, plan level, and plan unit. Set the workload-control parameters for each plan unit in which the workload-control planning method is applied. You can select infinite planning or workload control as planning method in the Master Planning Method field of the Plan Unit (cprpd6100m000) session.
Scenario The scenario for which LN maintains the workload control parameters. Plan Level The plan level for which LN records the workload-control parameters. Plan Unit The plan unit for which these parameters are valid, under the specified scenario and plan item. Backward Planning If this check box is selected, LN plans the production plan backwards. If this check box is cleared, LN skips the backward planning run of the workload control planning algorithm. Backward Plan. Rule This field determines how LN computes the items priority for planning, if you selected the Backward Planning check box, and LN cannot plan all plan items within one plan period. Note The Consider Item Priority field also influences the planning algorithm. Forward Planning If this check box is selected, LN plans the production plan forwards. If this check box is cleared, LN skips the forward planning run of the workload control planning algorithm. Forward Plan Rule This field determines how LN computes the items priority, if you selected the Forward Planning check box, and LN cannot plan all plan items within one plan period. The influence of the setting of this field on the the way that LN determines the items priority is also partly determined by the option that you select in the Consider Item Priority field. Consider Material Costs If this check box is selected, LN takes into account the material costs of an item to determine the item priority. This check box influences the way in which LN determines the item's priority as follows:
Consider Production Costs If this check box is selected, LN takes into account the production costs of an item to determine the item priority. This check box influences the way in which LN determines the items priority in the following way:
Consider Item Priority Determines if the item priority must be considered in the planning. The item priorities are defined in the Items - Planning (cprpd1100m000) session, and range from Lowest to Highest. Yes The priority of an item is considered in the workload control planning, together with the rules specified in the Backward Plan. Rule field and the Forward Plan Rule field. No The item priority is not taken into account in the planning. Only The items will be planned in order of highest item priority. The values of the Backward Plan. Rule and Forward Plan Rule fields will not be used. Capacity Consumption Based On This field determines how the capacity is consumed when the production plan is planned. Starting Point WLC Determines the starting point for the simulation.
| |||