Potential errors caused by inconsistent selection of order systemNote A planned item is an item with order system Planned. To plan the supply of planned items, you use the Enterprise Planning package. If the order systems of manufactured items are set up inconsistently, the following problems can occur:
LN does not automatically check the BOMs and routings for these incorrect item structures. To check and correct the order systems of a range of items, use the Check Order System for Planning (tibom1220m000) session.
| |||