Type of Duration
Indicates how the duration of a master routing operation for
depot repair or field service is determined.
Activity Duration
The manual entry is considered to determine duration of the
master routing operation.
Operation Lead Times
Total of the operation lead times (Labour Runtime, Machine
Runtime and Setup Time) is considered to determine duration of the master
routing operation.