Budget Cost Analysis Versions by Project (tpptc3500m000)

Use this session to list details of budget-cost analysis for the selected project.

 

Project

The code that uniquely identifies the project.

Description

The project status.

Cost Analysis Code

The code that uniquely identifies the budget-cost analysis

Related topics

Actual Cost Analysis

If this check box is selected, an actual cost analysis is available for the budget and the value is defaulted to the required sessions.

Budget Type

The type of budget for the project.

Allowed values

Budget Type

Plan

The code that uniquely identifies the plan.

Initial Budget

If this check box is selected, the budget cost analysis represents the initial budget data for a project. This is required so that the initial budget of a project can be captured and made available for future comparison. However, if the value of the Update Mode field is set to Read-only, the initial budget is frozen.

Last Calculation Time

The date on which the latest budget-cost analysis was performed via the Generate Budget Cost Analysis (tpptc3200m000) session for the selected budget-cost analysis version.

Last Calculation Login

The logon code of the user who performed the latest budget-cost analysis in the Generate Budget Cost Analysis (tpptc3200m000) session for the selected budget-cost analysis code.

Including Extension Costs

If this check box is selected, extensions are included in the budget-cost analysis calculation.

Exchange Rate Type Budget

A way to group currency exchange rates. You can assign different currency exchange rates to different invoice-to business partners and/or to different types of transactions (purchase, sales, and so on).