The level on which the data is printed.
The levels at which cost control is generated are selected in the Project - Cost Control Levels (tppdm6102m000) session.
Print Project Manager's Project-Control Report (tpppc4413m000)Use this session to print control reports at the element level. Reports can be based on element by cost type, cost component, control code, or cost object. You can make a choice between two reports, while you are entering the print job:
Level to be Printed The level on which the data is printed. The levels at which cost control is generated are selected in the Project - Cost Control Levels (tppdm6102m000) session. Payment Price per Unit You can print out the amount per unit calculated from the budget line or calculated from the element. The formula is: amount per unit = amount / quantity Calculation for Elements that cannot be Settled Elements that cannot be settled can be included in the report with their actual progress or their allowed progress. Period to The year up to which the level is to be printed. / The period up to which the level is to be printed. The costs for the report are accumulated up to this period. Currency Commitments If this check box is selected, the commitments are taken as costs. Sort Project by Indicates how you want the project to be sorted. Material If this check box is selected, this cost control cost type is printed. Labor If this check box is selected, this cost control cost type is printed.
| |||