| | Costing Breaks Production Resources (tppdm3102m000)Use this session to create and maintain the
costing breaks for the production resources linked to the project. For a project involving production of an item, you can create
costing breaks for the labor and/or the subcontracting costs (production
resources). You can create costing breaks for the main item, routing of the
item, operations linked to the routing, and by the work centers mapped to a
specific element or activity of the project. Note To manually copy the costing breaks to another project, select
the Copy to other Project option on the Actions menu. The
Copy to Other Project window opens wherein you can specify the target project
code. Project The code that identifies the project for which the costing break is
created. Note You can also create costing breaks for blank projects
(projects for which the project code is not specified). However, you must
specify the standard element/activity to create costing breaks. Cost Type The cost type for which the costing break is
created. Note By default, the value is set to Not Applicable. Main Item The main item for which the costing break is created. Note You must leave this field blank to create costing breaks for
the work center. When you specify only the main item and set the Cost Type field to Labor,
the costing break is linked to all the routings defined for the specified Main Item. Description The description or name of the code. Routing The routing code of the main item. Note This field is enabled only if the Cost Type field is set to Not Applicable. When you specify the routing code for the main item and the Operation field is empty, the costing break is linked
to all the operations related to the specified Routing. Operation The code that identifies the operation linked to the routing of the main
item. Note This field is disabled if the Routing field is empty. Work Center The work center linked to the project for which the costing breaks are
created. Note This field is enabled only if the Main Item field is empty. When you specify only the Work Center, the costing break is linked to the
specified work center. Description The description or name of the code. Element The element for which the costing break is
created. Note You must specify the standard element or the standard
activity for a blank project. Description The description or name of the code. Activity The activity for which the costing break is
created. Note You must specify the standard element or the standard
activity for a blank project. Description The description or name of the code. | |