Subcontract Operations (tisfc2210m000)

Use this session to subcontract operations that were not planned to subcontract when the routing was defined. Select a range of operations that you want to subcontract, and assign the operations to a specific subcontracting work center.

 

Production Order

The production order for which you want to subcontract some or all operations.

Production Order

The order status of the production order.

Allowed values

Order Status

Item

The item produced by the production order.

Order Quantity

The order quantity to be produced. The estimates of materials and hours are based on this quantity.

Operation

The range of operations that you want to subcontract.

LN assigns the operations to the work center and the subcontractor that you specify and update their planned dates.

Work Center

The work center where the subcontracted operations are performed.

The work center must be of the Subcontracting Work Center type, and must be linked to the selected buy-from business partner.

Note

A sub work center is a subdivision of a main work center, not a subcontracting work center.

Subcontractor

A business partner that is hired to perform certain services, such as the execution of a part of a project or production order. The services are delivered via a purchase order.

The subcontractor is a buy-from business partner whom you want to carry out the selected operations.

If the subcontractor is not active on the production order date, you get the following error message: Business partner not active on production order effective date.

Machine

The machine on which the subcontracted operation(s) will be performed.

If you enter a machine in this field, the subcontracted operation(s) will be performed on that machine. The Machine Occupation field in the Production Planning (tisfc0110m000) details session automatically gets the value 1.

If you do not enter a machine in this field, no machine is used for the subcontracted operation(s). The Machine Occupation field in the Production Planning (tisfc0110m000) details session gets the value 0 (zero). The Machine field in the Production Planning (tisfc0110m000) details session is emptied.

In this session you can enter a range of operations that you want to subcontract. However, an operation can already be a planned subcontracted operation if it is linked to a subcontracted work center in the Routing Operations (tirou1102m000) details session. Also a subcontracted machine can already be defined. The operations in the range that are already subcontracted will not have their machine(s) replaced by the machine entered in this field if the following is true:

  • The work center of the subcontracted operation equals the work center that you enter in this session's Work Center field.

If the work center of an already subcontracted operation differs from the work center that you enter in this session's Work Center field, the machine entered in this field will replace an already existing subcontracted machine.

Rate Factor

The value that is used to estimate the subcontracting costs by the Operation Rate method.

In this method, the estimated subcontracting costs are calculated by multiplying the gross output quantity, the subcontracting rate factor and the subcontracting rate.

If you use another calculation method, this field is not used.

You can start the Subcontracting Rates (ticpr1160m000) session by clicking the button.

Subcontracting with Material Flow

If this check box is selected, LN supports the physical and administrative flow of material and subassemblies to the subcontractor.

Subassembly

An intermediary product in a production process that is not stored or sold as an end product, but that is passed on to the next operation.

For subcontracting purposes, a manufacturer can send a subassembly to a subcontractor to carry out work on the subassembly. This subassembly has its own item code defined in the Item Base Data.

After work is finished, the subcontractor sends the subassembly back to the manufacturer. Also this reworked subassembly has its own item code defined in the Item Base Data.

Subassembly Warehouse

The warehouse from which the subassembly is sent or in which the subassembly is received.

Subassembly

An intermediary product in a production process that is not stored or sold as an end product, but that is passed on to the next operation.

For subcontracting purposes, a manufacturer can send a subassembly to a subcontractor to carry out work on the subassembly. This subassembly has its own item code defined in the Item Base Data.

After work is finished, the subcontractor sends the subassembly back to the manufacturer. Also this reworked subassembly has its own item code defined in the Item Base Data.

Subassembly Warehouse

The warehouse from which the subassembly is sent or in which the subassembly is received.

 

Subcontract

Printing the subcontracting report.

Subcontr. Rates

Start Subcontracting Rates (ticpr1160m000) session.

Replan Queue-/Move Times

Start replanning queue time and move time