An order to produce a specified quantity of an item on a specified delivery date.
Release Production Orders (tisfc0204m000)Use this session to release production orders to the shop floor. The production order status changes to Released. A production order with the Released status indicates that production can start, for example, materials can be issued, and spent hours can be accounted. LN performs the following actions when releasing a production order:
Note If the Printing Order Doc. Mandatory check box in the Shop Floor Control Parameters (tisfc0100s000) session is selected, you can run the Release Production Orders (tisfc0204m000) session when the order status is Documents Printed. Repetitive items can be released regardless of this parameter. To release only the production orders for which the required materials are available, select the Check Shortages check box. For more information, refer to Material shortage checking. If the Check Material Shortages at Release check box in the Shop Floor Control Parameters (tisfc0100s000) session is selected, you can select the Check Shortages check box under Options to check the availability of the required materials. If that check box is selected, LN does not release the production orders for which the required materials are not available in time.
Selection Range Production Order An order to produce a specified quantity of an item on a specified delivery date. Project A collection of manufacturing and purchasing actions that are performed especially for a particular customer order. A project is initiated by a customer order for items having a To Order order policy. The purpose of a project is to plan and coordinate the production of these items. For a standard-to-order production, the project is only used to link the item with the customer order. Otherwise, a project can include:
A budget is a special type of project. A budget is used to plan and estimate, not to carry out production. Production Start Date and Time This field refers to the production start date and time field in the Production Orders (tisfc0501m000) session. Planned Delivery Date The date the finished items are finished according to the planning. Item Group Warehouse Planner The user name of the employee that is responsible for planning plan items. Shop Floor Planner Routing Group Product Line Product Class Selection Code Item Selection Item From Grouping Selection SFC Order Group If this check box is selected, all the production orders in the SFC order group that you select are released. If any production orders cannot be released (for example, the order documents are not printed and you have specified that they must be, in the Shop Floor Control Parameters (tisfc0100s000) session), LN prints an error report. SFC Order Group The code of the SFC order group. Work Center Selection Work Center Selection If this check box is selected, only the production orders with their first operation in the range of work centers you enter will be released. Note
Work Center Only the production orders with their first operation in the range of work centers you enter here will be released. Allowed values
You must first select the Work Center Selection check box. Options Check Shortages If this check box is selected, the session checks for shortages of required materials before releasing the production orders. This option is available only if the Check Material Shortages at Release check box in the Shop Floor Control Parameters (tisfc0100s000) session is selected. Interactive If this check box is selected, LN displays a list of production orders with an indicator that shows for which production orders a material shortage occurs. You can then select the production orders to release from this list. Check Determines what kind of check this session performs. Allowed values
Scope Determines from which warehouses LN takes the available inventory into account. Allowed values
If the Check field is Multilevel, this field is Planned Warehouses in Cluster and cannot be changed. Skip Blocked Inventory If this check box is selected, LN does not take the inventory that is blocked into account for analyzing the production orders' material supply. Inventory can be blocked for inspection or for other reasons. Select this check box if you expect the material quality to be poor. If the Check field is Multilevel, this check box is automatically set the same as the Inventory in Inspection Available for Planning check box in the Inventory Handling Parameters (whinh0100m000) session and cannot be changed. Critical Items Only If this check box is selected, LN checks only the materials for which the Critical for Inventory Check check box in the Items - Production (tiipd0101m000) session is selected. Note If you check multilevel, and a material that is not critical has lower-level materials that are critical, LN will check these lower-level materials. Shortage Report If this check box is selected, this session prints a shortage report identical to the one printed by the Print Material Shortages by Production Order (tisfc0419m000) session. Print Select the type of orders to be printed: Allowed values
Process Report If this check box is selected, LN prints the process report. Error Report If this check box is selected, LN prints the error report.
Release Releases the production order.
| |||