Operation Steps (tirou1105m000)

Use this session to define operation steps of a microrouting.

Related topics

 

Item

An item that occurs in any module of Manufacturing. It is a purchased, manufactured, or generic item that is used in a generic/production bill of material or in a generic/production routing.

Routing

The sequence of operations required to manufacture an item.

For each operation, the task, machine, and work center are specified, as well as information about setup time and cycle time.

Operation

One of a series of steps in a routing that are carried out successively to produce an item.

The following data is collected during a routing operation:

  • The task. For example, sawing.
  • The machine used to carry out the task (optional). For example, sawing machine.
  • The place where the task is carried out (work center). For example, woodwork.
  • The number of employees required to carry out the task.

This data is used to compute order lead times, to plan production orders and to calculate cost prices.

Operation Step

A suboperation connected to a routing operation.

An operation step can contain information such as, instructions, process information, and tools information.

Reference Designator

Indicates the location to insert a component on an item, for example, where to mount an electronic component on a Printed Circuit Board. Reference designators are often used in electronics, and can originate from a Computer-Aided Design (CAD) station.

From this field, you can zoom to the Reference Designators by Item (tcibd0120m000) session.

Routing

The quantity of the manufactured item on which the routing is based. A routing quantity enables you to include very short operation times in the routing of an item.

Example
Routing quantity100
Cycle time60 minutes

 

In a 60 minute time span, 100 items are produced. Consequently, the operation time of one item is 0.6 minute.

Routing