E-Item Revisions by MBC (tiedm3540m000)

Use this session to display which E-item revisions are linked to a mass bill of material change (MBC)). You can see details in the E-Item Revisions by MBC (tiedm3540m000) details session.

You can link revisions, or delete a link, to an MBC line in the E-Item by MBC (tiedm3122m000) session.

 

MBC Number

The code of the MBC to which revisions are linked.

MBC Number

The MBC's status.

Engineering Item

The E-item whose revisions are linked to the MBC. For more details, double-click the E-item.

Description

The description or name of the code.

Rev.

The E-item revision, which is linked to the MBC.

Status

The status of the revision.

Related topics

Effective Date
Expiry Date

When the revision is no longer valid.

Engineer

The employee responsible for the revision.

E-Item Revision Text

If this check box is selected, a text is present.

To view the text, click the Text button.

Material

What the revision is made of, for example paper, plastic, or wood.

BOM Quantity

The number of manufactured items to which a bill of materials (BOM) applies. The BOM quantity enables you to specify very small item quantities as BOM components.

Example

You need very small amounts of certain colors to mix one liter of a specific paint, Cotton White. Therefore, a BOM quantity of 1000 liter is defined. The component quantities for the paint can then be as follows:

Paint Cotton White, 1000 liter:
White999 liter
Yellow0.6 liter
Red0.2 liter
Blue0.2 liter

 

Size

How large the revision is. For example 200 mm x 1 meter.

Unit Set
Norm Standard

The company, national or international standard to which the revision conforms (or must conform). For example, ISO 8601, NEN 3140, BS 1383.

Unit
Weight