The code for the item that must be replaced in the bills of material (BOMs).
Replace Item in Bill of Material (tibom1212m000)Use this session to subtitle or delete items that are used in bills of material (BOMs).
Item to be Replaced The code for the item that must be replaced in the bills of material (BOMs). Replacement Item The replacement item code in the bills of material (BOMs). If no replacement item is entered, the original item is deleted. Check Date The date that is used to select the bills of material (BOMs) line that must be changed. A BOM line is only selected if the check date is between a BOM line's effective date and expiry date. Effective Date The effective date when new items will be used instead of old items. Default value Current date From/To Item The range of manufactured items for which you want to replace one or more bills of material (BOMs) component items. Retain Original Item If this check box is selected, LN does not delete the BOM lines of the item to be replaced. LN uses a new BOM sequence number (as a subdivision of the old position number) for the replacement item. This enables you to see which items have been replaced, and provides a history on the BOM lines. Retain Effective Date If this check box is selected, you cannot use the Effective Date field anymore. As a result, the bills of material (BOMs) line for which the item is replaced keeps its original effective date. If this check box is cleared, the date in the Effective Date field is the effective date for the changed BOM line. Replace EBOM-linked Items also If this check box is selected, LN replaces bills of material (BOMs) components with the Link with EDM check box in the Bill of Material (tibom1110m000) session is selected. If this check box is cleared, components with the Link with EDM check box selected in the Bill of Material (tibom1110m000) session are not replaced.
| |||