To set up data for subcontracting (old flow)

This functionality is specific for India.

Complete the following steps to set up data for the production order for subcontracting the manufacture of goods:

  • Create required items
    • In the Items - General (tcibd0501m000) session, create a manufactured item, a purchase item and subassembly items.
    • In the Production Planning (tisfc0110m000) session, the Subcontracting challan With Old Flow must be selected.
    • In the Bill of Material (tibom1110m000) session, enter the created purchase item and required details to maintain the BOM data.
    • In the Item - Routings (tirou1101m000) session, specify the routing sequence number, order quantity and other required details to maintain the routing data.
    • In the Routing Operations (tirou1102m000) session, specify the Task, Work Center, Machine, Cycle Time [Min], Average Setup Time, Subassembly and the Subassembly Warehouse for each of the operation lines.
    • In the Operational tab, specify the sub-assembly and the warehouse for each of the operation lines.
    • In the Subcontracting Rates (ticpr1160m000) session, specify the task and the subcontracting rate for the items sent. Link the subcontracted service item and attach the cost component .