| | Outbound/InspectionsThe outbound process is used to issue
goods from the warehouse. To issue and ship goods from a warehouse, warehouse
processing is either based on handling units or outbound shipments and
warehousing order lines. If you use handling units to process goods, the order
lines and/or shipments related to the handling units are updated in the
background. Run number A run number is a code assigned to a group of warehousing order lines when
they are advised. LN assigns or generates a run number if a user does not manually enter or select a
run number while he generates inbound or outbound advice for a group of
warehousing order lines. For inbound movements, the user can generate storage lists
and confirm storage lists by run. For outbound movements, the user can release
outbound advice, generate picking lists, and confirm picking lists by
run. The outbound and shipment procedures comprise the activities
that you must perform in LN to issue and, if required, inspect goods that you want to store in
the warehouse. This procedure also describes all steps, also called activities, of the outbound and inspection procedures
and shows how the steps can be executed. The outbound warehouse inspections can
only be approved or rejected. Outbound advice is a list generated by LN that advises the
location and lot from which goods must be picked, taking into account factors
such as blocked locations and the outbound method. Outbound advice comprises the instructions to move items to
be issued out of the warehouse. An individual outbound advice line might read
as follows: Take 10 pieces of item A from location Pick 3 and put them in
location Staging 5. After the outbound advice is generated for the outbound
order lines, you can modify the outbound advice. If the Full Packages Only functionality is implemented and
the modified advised quantity is not in multiples of full packages, a warning
message is displayed. During the confirmation of shipments, you can modify the
advised quantity to multiples of full packages. During the outbound process, issuing project pegged goods
from a warehouse result in inventory transactions that are based on the peg
distribution. During outbound advice and inspections, the outbound order line
cost peg distribution is updated with the advised quantities, approved
quantities, and the rejected quantities. When the goods arrive at the staging
location and are shipped, the actual pegs are created. During the confirmation
process, the shipment line peg distribution is created. Unlike inbound
inspections, the outbound inspection is not a warehousing procedure in its own
right, but an activity that you can add to the outbound procedure. You can add
the outbound inspection step to a warehousing procedure if the setup for the
warehouse, supplier, or item requires item inspection. If the inspection activity is included in the warehousing
procedure, LN creates
an inspection record in the Warehouse Inspections (whinh3122m000) session after the outbound advice is
released or the picking list is confirmed, and the status of the related
outbound order lines changes to To be Inspected. You can then approve, reject, or scrap and process the
items in the Warehouse Inspections (whinh3122m000) session or the Warehouse Inspection (whinh3622m000) session. Outbound order lines related to approved and processed items
obtain the Staged status. This status implies that the goods have
been moved to the loading area of the warehouse and are about to be shipped.
For Staged order lines, ERP LN 6.1 creates shipment lines. You can perform The shipment procedure for these lines. Rejected and processed item
quantities are removed from inventory or sent to the quarantine warehouse or
quarantine location without using the outbound procedure. The rejected
quantities are updated on the outbound order lines. Picking list A Picking list is a document that lists the material to be picked for
manufacturing or shipping orders. This document is used by operating personnel
to pick manufacturing or shipping orders. You can generate picking list for
every run number and generate a new picking list for a new picking mission. For project pegged outbound order lines, you can interchange
the effectivity units when there is no inventory available
for the ordered effectivity unit. To order components from suppliers, automobile
manufacturers apply various procedures that all automotive suppliers must
comply with. One of these procedures is called CINDI, which is an extensive
procedure consisting of these aspects: - Transport ID
- Distribution Zone/ Routing Code
- RAN/ KANBAN number/ Delivery call number
- Point of consumption/ Point of destination
| |