| | Project DefinitionThis topic describes the remaining differences between Infor LN 10.3 and Infor LN 10.4 in Project Definition. New and changed functionality - To indicate the probability that the fee and penalty is to be
awarded to or levied on the contractor, the Probability field is added to the Fees and Penalties (tppin0180m000) session.
- To include the minimum percentage of fee revenue while
generating the interim results, the Fee Revenue Threshold field is added to the following sessions:
Contract Interim Results The new COGS (Cost of Goods) Method, Percentage of Completion and Percentage Completed field for COGS are added to the
following sessions:
When calculating the COGS, Infor LN also
considers the loss component. These values are defaulted to the project activities related
to the specified Earned Value Method. OBS Functionality The organization breakdown structure functionality is
applicable only if the All Activity Types check box is selected in the General Project Parameters (tppdm0100s000) session.
| |