Project Definition

This topic describes the remaining differences between Infor LN 10.3 and Infor LN 10.4 in Project Definition.

New and changed functionality
  • To indicate the probability that the fee and penalty is to be awarded to or levied on the contractor, the Probability field is added to the Fees and Penalties (tppin0180m000) session.
  • To include the minimum percentage of fee revenue while generating the interim results, the Fee Revenue Threshold field is added to the following sessions:

When calculating the COGS, Infor LN also considers the loss component.

These values are defaulted to the project activities related to the specified Earned Value Method.

  • OBS Functionality
    The organization breakdown structure functionality is applicable only if the All Activity Types check box is selected in the General Project Parameters (tppdm0100s000) session.