| | Estimating SurchargesInfor LN 10.3 Standard surcharges cannot be included in
estimating. Infor LN 10.4 - You can include the standard surcharges for the cost
objects, cost types, or cost components specified on the estimate lines. The
estimate surcharges can be calculated using the Calculate Estimate Surcharges (tpest2200m100) session. A new estimate line with the Line Type set to Indirect is added that includes the calculated
surcharges, in this session.
For more information, refer to To define an estimate. | |