Item configuration for contract deliverablesNew Functionality You can now configure generic items from a contract deliverable. The product variant resulting from configuration is stored on the contract deliverable and can be reused on the same contract. The generic item attached to a contract deliverable can be turned into a customized item before the deliverable status is set to Active. The items must have the order policy To Order with With PCS set to No for configuration to a customized item. Customized items that have a PCS project are not supported. The Inherit Project Peg and Mandatory Project Peg check boxes are now available for generic items in the Items - General (tcibd0501m000) session if these condition are met:
New and changed fields and sessions
New sessions
| |||||||||||||||||||||||