Item configuration for contract deliverables

New Functionality

You can now configure generic items from a contract deliverable. The product variant resulting from configuration is stored on the contract deliverable and can be reused on the same contract.

The generic item attached to a contract deliverable can be turned into a customized item before the deliverable status is set to Active. The items must have the order policy To Order with With PCS set to No for configuration to a customized item. Customized items that have a PCS project are not supported.

The Inherit Project Peg and Mandatory Project Peg check boxes are now available for generic items in the Items - General (tcibd0501m000) session if these condition are met:

Before LN 10.4
ItemOrder Policy
PWP ItemAnonymous
PCS ItemTo Order

 

LN 10.4
ItemOrder PolicyWith PCS
PWP ItemTo OrderNo
PCS ItemTo OrderYes

 

New and changed fields and sessions