| | Actual CostingNew and changed functionality If Use Actual Cost Price for Receipt Posting is selected together with Financial Transactions by Work Center the costs for WIP transfers are calculated
using actual costs. The effective cost component structure of the end item is
used to calculate the costs. The actual value of the WIP transfers amounts is
calculated by selecting all incoming financial transaction related to the
operation set minus the outgoing financial transactions. The result is
multiplied by the current receipt quantity divided by the total quantity
received. All costs that are not already transferred to the
effective cost component structure of the end item are handled using a
completion transaction. The receipt transaction with the cost on cost component
level is now possible. In Infor LN 10.4 it is possible to use Subcontracting with Material Flow in combination with
actual costing. If items with operation subcontracting with material flow
is implemented, the semi-finished manufactured end items produced prior to the
subcontracting operation are send to the subcontractor, the value of this
subassembly item is based on the actual production order costs incurred up to
the subcontracting operation. Once the subcontracting activities are done, the work in
progress is received back from the subcontractor. The work in progress received
from the subcontractor is represented by means of a subassembly item with a
different item code from the outgoing subassembly. In terms of value, the
incoming subassembly reflects the actual production order costs up to the
operation following the subcontracting operation on the production order. This
includes the work in progress that was send to the subcontractor, the amount to
be paid for subcontracting activities and the costs of additional materials
owned by the manufacturer. As subassemblies can be delivered from shop floor
inventory through partial receipts, each time one or more subassemblies are
delivered from shop floor to inventory, the appropriate portion of the actual
production order costs incurred is added to the subcontracting WIP value for
the outgoing subassembly.
New sessions You can use this session to view the various
subcontracting costs. This is an overview session that refers to the following
session: Subcontracting WIP Actual Amounts (ticst0509m000), Subcontracting WIP Amounts (ticst0580m000) and Subcontracting WIP Actual Amounts by Project Peg (ticst0509m100) sessions. You can use this session to view the subcontracting WIP
actual amounts. You can use this session to view the amounts that are
used to create financial transactions related to subcontracting. You can use this session to view the actual costs of the
subcontracting WIPs by project peg.
| |