Resource exception messages

Resource exception messages are related to the planning of resources. They warn you when there is a utilization or workload problem.

You can use the following sessions to analyze and resolve these exception messages:

Overloaded Resource

The resource is overutilized. This type of exception message is generated when the utilization for a plan period exceeds 100 % plus the tolerance percentage specified for this exception message type in the Exception Message Types by Planner (cprao1110m000) session.

Workload < Norm

The workload that is on the shop floor is lower than the workload norm specified in the Resource (cprpd2100m000) session taking into account the workload tolerance specified in this same session.

In determining the workload, only the following fields in the Resource Master Plan (cprmp3501m000) session are considered:

Workload > Norm

The workload that is on the shop floor is higher than the workload norm specified in the Resource (cprpd2100m000) session (taking into account the workload tolerance specified in this same session).

In determining the workload, only the following fields in the Resource Master Plan (cprmp3501m000) session are considered:

Resource CTP < Zero

The CTP of the resource is lower than zero (0). This means that the load on the resource, including newly accepted customer orders, is too high. This type of exception message is only generated for resources which are defined as critical in CTP in the Resource (cprpd2100m000) session.