LN generates the planned activity number based on the data specified in Number Group for Planned Activities and Series for Planned Activities fields in Service Planning and Concepts Parameters (tsspc0100m000) session.
Planned Activity - Costs Overview (tsspc2513m000)Use this session to display the cost amounts of a planned activity. The cost overview details the cost aggregates of the item with regard to the item, Installation group or activity or a combination of the same. Note After you make changes to the requirements of a planned activity, choose Recalculate Amounts on the appropriate menu to update the cost amounts.
Planned Activity Number The number that identifies serialized item for the planned activities. Note LN generates the planned activity number based on the data specified in Number Group for Planned Activities and Series for Planned Activities fields in Service Planning and Concepts Parameters (tsspc0100m000) session. Activity Line Number The line number that distinguishes one Planned Activity from
another for the same Planned Activity Number. Note LN generates the planned activity line number based on the data specified in Number Group for Planned Activities, Series for Planned Activities and Step Size for Activity in Service Planning and Concepts Parameters (tsspc0100m000) session. Installation Group The installation group for which the activity is planned and hence, costs are displayed. Installation Group The name or description of the Installation group. Owner The sold-to business partner or
the internal department that owns the Installation group. Activity The activity, for which the costs are listed that is planned
for the maintenance of the serialized item. Description The description or name of the code. Item The code of the item for which the cost is
calculated. Description The description or name of the item. Serial Number The serial number of the
serialized item for which the cost is calculated. Cost Type The code of the cost type listed for the
planned activity. Cost Amount The total cost amount (of the cost type) for the planned
activity. [ A generally accepted medium of exchange such as coins, treasury
notes, and banknotes. The following currency types are available in LN:
| |||