Generate Maintenance Plan (tsspc2200m000)Use this session to generate maintenance plans for a range of Installation groups. Note
Installation Group The From and To fields define a range of: installation group. Installation Group The From and To fields define a range of: installation group. Time The From and To fields define a range of: time period considered to generate the
plan. Time The From and To fields define a range of: time period considered to generate the
plan. Only Generate Maintenance Plan for Active Contract Period If this check box is selected, LN considers only the active contract period for generation of the
plan. Consider Last Planned Activity Date by Scenario Line If this check box is selected, LN considers the last planned activity date for generation of the
plan. Consider Planned Until Time of Serialized Item If this check box is selected, LN considers the serialized item's planned until time. Consider Maintenance Cycle If this check box is selected, LN considers the maintenance cycle for generation of the
plan. Consider Life Cycle If this check box is selected, LN considers the item's life cycle for generation of the
plan. Start Maintenance Cycle The options to initiate the maintenance cycle. Allowed values Consider Last Planned Activity Date as Maintenance Cycle Start Time If this check box is selected, LN considers the last planned activity date as maintenance cycle
start time. Use service department of reference activity for planned activities If this check box is selected, LN uses the service department of the reference activity for planned
activities. Block Maintenance Planning if Required Resources Cannot be created If this check box is selected, LN blocks the generation of the maintenance plan if the required
resources cannot be created. Delete Planned Activities for Scenario Line If this check box is selected, LN deletes the planned activities for the selected maintenance
scenario line. Delete All Planned Activities in Range If this check box is selected, LN deletes all the planned activities in the specified
range. Activity Status The status of the activities being generated for the
maintenance plan. Allowed values Simulation If this check box is selected, LN simulates the plan. Process Report The Process report. Error Report The Error report. Information Report If this check box is selected, LN prints the plan information report.
| |||