Copy Project Breakdown Structure (tscfg2210m200)

Use this session to create a physical-breakdown structure, from a project-breakdown structure in Project. The project elements are transformed into serialized items.

Note

To use this session, the following conditions must be met:

  • Project is implemented.

 

Project
The project from which the physical breakdown will be created.
Note
  • You can also use free projects. If you do so, be aware that changes made to the project after you have copied the project, are not processed to Service.
  • For the entered project, the value of the Project Package Linked field in the General Projects (tcmcs0552m000) session, must be Project.
Project
The name or description of the project.
Origin Structure
Select the type of project-breakdown structure from which the physical breakdown must be created.
Project Element/Activity
Element Structure and Activity Structures are the types of project. If you select Activity Structure in the Origin Structure field, the code of the activity for the selected project is displayed. If you select Element Structure in the Origin Structure field, the code of the top element for the selected project is displayed here. (Refer to the Element Budget Structure (tpptc1509m000) session).
Project Element/Activity
The description or name of the code.
Installation Group
The code of the installation group to which the newly-created physical breakdown will belong.
Description
The description or name of the code.
Serialized Item Group
The serialized-item group of the newly-created serialized items.
Note

If the Serialized Item Group Usage parameter check box in the Configuration Management Parameters (tscfg0100m000) session is selected, this field must be filled.

Description
The name or description of the serialized item group.
Delivery Time
The delivery time of the newly created serialized item. If you do not specify the value, LN considers the current time as the delivery time.
Process Report
Error Report
Copy Materials
If this check box is selected, the material lines associated to the project are also copied. For the material lines to be copied, Material Cost History line must be present.
Generate Dummy Serial Numbers
If this check box is selected,, dummy serial numbers are generated.