The From and To fields define a range of: projects.
Performance-Measurement using EVM (Graph) (tppss0702m000)Use this session to create a graph of the performance figures in the Performance Measurement Activity (tpppc5540m000) session. The graph gives you an insight into the totals per project. By looking at the analysis of the Schedule Variance and the Cost Variance, you can adjust your planning.
Project The From and To fields define a range of: projects. Project The From and To fields define a range of: projects. Period to The first year for which you want to display the graph. / The first period for which you want to display the graph. / The last year for which you want to display the graph. / The last period for which you want to display the graph. Generate Code The code of the generated performance measurement that you want
to display. Scheduled Work If this check box is selected, the budgeted costs of work scheduled are displayed. Performed If this check box is selected, the budgeted costs of work performed are displayed. Budget at Completion If this check box is selected, the Budget at Completion
(BAC) is displayed. Estimate at Completion If this check box is selected, the Estimate at
Completion (EAC) is displayed. Note The EAC can not be displayed if the leading forecast method is Estimate Extra Cost. Actuals If this check box is selected, the actual costs are
displayed. Incl. Commitments If this check box is selected, the commitments are
included in the actual costs. Actual Revenues If this check box is selected, the actual revenues are
displayed. Note Actual Revenues are registered when project data is transferred in the Transfer Project Data to Central Invoicing (tppin4200m000) session. Planned Revenues If this check box is selected, the planned revenues are
displayed. Note Planned revenues are obtained from advances and installments. Incl. Forecast If this check box is selected, the forecasts are
included in the planned revenues. Material Costs If this check box is selected, the material costs are
displayed. Subcontracting Costs If this check box is selected, the subcontracting costs
are displayed. Labor Costs If this check box is selected, the labor costs are
displayed. Sundry Cost If this check box is selected, the sundry cost are
displayed. Equipment Costs If this check box is selected, the equipment costs are
displayed. Currency A generally accepted medium of exchange such as coins, treasury
notes, and banknotes. The following currency types are available in LN:
| |||