Baselines (tppss0520m000)Use this session to view the baselines (planning) for a project, which you can maintain in the Baseline (tppss0120s000) details session.
Project The code that uniquely identifies the project. The description or name of the code. Status The way to characterize a project. LN distinguishes these statuses:
Baseline The baseline can be seen as a snapshot of the active plan's
scheduled activities' start and end dates for a specific date and time. Baseline Status If you generate a new time-phased budget, the status of the
current baseline can be useful to distinguish different baselines. Note The baseline data cannot be updated after the baseline status is Approved. Approval Date The date and time of approval of the baseline. Derived from Baseline The baseline from which the current baseline is derived. Creation Date The date and time of creation of the baseline. Date of Last Update The date and time the baseline was last updated. Text If this check box is selected, a text is present.
| |||