PSS Parameters (tppss0100s000)

Use this session to maintain the parameters for project planning, the external scheduling package, and requirement planning, as well as their default settings.

Note

By default, the Description field contains the date and time when the previous parameter set was saved. In order to avoid confusion, if you change the parameters, change or delete the Description as well.

Related topics

 

Scheduling
Introduction Date
The date on which you change one or more parameters in this session is the date this new parameter setting becomes valid.
Plan
The default plan to be used when you create a project from scratch, that is, without using a template or copying an existing project.
Code Length of Activity
The maximum length of the activity code is eight characters.
External Scheduling Package
Integration External Scheduling Package
If this check box is selected, the project is integrated with the external scheduling package.
Currency
The currency in which prices and rates in the external scheduling package are expressed.
Budget Quantity Time Unit
The quantity of resources assigned (cost objects such as equipment, labor, or subcontracting) expressed in terms of time.

Allowed values

Description
The description or name of the code.
Date Type for Scheduling in ESP
You can choose one of the two date types determined by the external scheduling package (ESP) to schedule your activities in ERP Enterprise.

Allowed values

Date Type for ESP

Export Actual Spent Hours
If this check box is selected, LN exports the data for actual hours spent to the external scheduling package.
Note

The actual spent hours are calculated based on the hours for the cost objects such as labor, equipment and subcontracting.

Repository Location
The path to the copy of the project XML file.
Note

The copy of an XML file, which is exported or imported from an External Scheduling Package, is stored at this secure location.

Transfer Resources (Export)
Material
If this check box is selected, material data is transferred to the external scheduling package (ESP) that you use. By default, this checkbox is selected for new projects exported using the External Scheduling Interface (tppss2231m000) session.
Labor
If this check box is selected, labor is transferred to the external scheduling package (ESP) that you use. By default, this checkbox is selected for new projects exported using the External Scheduling Interface (tppss2231m000) session.
Employees
If this check box is selected, employee data is transferred to the external scheduling package (ESP) that you use. By default, this checkbox is selected for new projects exported using the External Scheduling Interface (tppss2231m000) session.
Trade Group
If this check box is selected, trade groups data is transferred to the external scheduling package (ESP) that you use.
Equipment
If this check box is selected, equipment data is transferred to the external scheduling package (ESP) that you use. By default, this checkbox is selected for new projects exported using the External Scheduling Interface (tppss2231m000) session.
Subcontracting
If this check box is selected, subcontracting data is transferred to the external scheduling package (ESP) that you use. By default, this checkbox is selected for new projects exported using the External Scheduling Interface (tppss2231m000) session.
Sundry Costs
If this check box is selected, sundry data is transferred to the external scheduling package (ESP) that you use. By default, this checkbox is selected for new projects exported using the External Scheduling Interface (tppss2231m000) session.
Transfer Assignments (Export)
Material
The assignment level of material cost objects (resources) exported to the activities/budget lines (tasks) of the external schedule package. By default, the assignment level is set to the value set in this field, for new projects exported in the External Scheduling Interface (tppss2231m000) session.
Labor
The assignment level of labor cost objects (resources) exported to the activities/budget lines (tasks) of the external schedule package.
Equipment
The assignment level of equipment cost objects (resources) exported to the activities/budget lines (tasks) of the external schedule package.
Subcontracting Costs
The assignment level of subcontracting cost objects (resources) exported to the activities/budget lines (tasks) of the external schedule package.
Sundry Costs
The assignment level of sundry costs to be exported to an external schedule package.
Code Lengths in ESP
Activity
The code length of the activity in the external scheduling package.
Activity Structure
The code length of the activity structure in the external scheduling package. This means all structure codes with comma's and dots together.
Note

In an integration with OpenPlan Enterprise you are advised not to exceed 59 characters.

Resource
The code length of the resource in the external scheduling package.
Activity/Budget Line Relationships
Default Lead/Lag Unit
Define the default time unit used for the lead/lag time.
Number Group
The default number group defined for the activity/budget relationship.
Description
The description or name of the code. for the number group.
Series
The code that identifies the order series for the specific activity/budget relationship number group.
Description
The description or name of the code. for the series.
Requirements
Project Requirements Planning
PRP Warehouse Orders Number Group
The default number group for planned PRP warehouse orders.
Warehouse Order Series
The default order series for planned PRP warehouse orders.
PRP Purchase Orders Number Group
The default number group for the planned PRP purchase orders.
Purchase Order Series
The default order series for PRP purchase orders.
Check Inventory for Warehouse Deliveries
If this check box is selected, the availability of inventory for warehouse deliveries is selected.
  • If negative stock is not allowed, the check investigates whether the quantity of the planned PRP warehouse order is less than or equal to stock on hand, minus blocked stock, minus allocated stock. If this condition is not met, an error message appears.
  • If negative stock is allowed, the check looks at the planned inventory. If there is not enough planned inventory at the moment of delivery, an error message appears.

Where the check reveals that none of these conditions is met, planned PRP warehouse orders (except those used to transfer a customized item) cannot be confirmed.

Create Backorders for Warehouse Transfer Orders
If this check box is selected, Warehousing creates a backorder for projects during inventory shortage.
Service Orders Number Group
The default number group defined for the service orders.
Service Order Series
The code that identifies the order series for the specific service order number group.
Released +
Maintain PRP orders for work authorization status.

This field can have the following values:

  • No Value: LN allows creation of PRP orders for activities with work authorization status set to Released.
  • Free: LN allows creation of PRP orders for activities with work authorization status set to Free.
  • On Hold: LN allows creation of PRP orders for activities with work authorization status set to On Hold.
  • Free, Released, On Hold: LN allows creation of PRP orders for activities with work authorization set to Free or On Hold or Released.
Note

You can create planned PRP order for activities with work authorization status set to Released.

BOM Explosion
If this check box is selected, and the PRP planned warehouse order, for a phantom item, is transferred to Warehousing, LN creates an actual warehouse order which contains the items of the BOM of the phantom item.

 

Print Parameters
Starts the Print Parameters (tppdm0400m000) session which prints the parameters of LN Project.