Overhead Application Bases (tppdm2100m000)

Use this session to create and maintain overhead application bases.

 

Base
The code that uniquely identifies the overhead application base.
Description
The description or name of the code.
Version
The version number that LN generates based on the unique base-code. This is a display field.
Note

The first version of an overhead application base takes the default value of 0001. If another version is created for the overhead application base with the same base-code and same validity period, the second version takes the value 0002 (value of first version +1).

Level
The level at which the overheads must be calculated.
Note
  • The field Level is enabled and mandatory only if the field Base Type is set to Amount.
  • If the field Base Type is set to Direct Labor Hours, the value is always 1.
  • The overheads over overheads can be calculated only if the value in the field Level is 2 or more.
  • The Level (allowable values 1 to 9) determines the sequence in which overhead is calculated. Overhead of base with level 1 (the tab Assignments Cost Base contains only direct costs) is calculated first. After calculating the overhead of base with level 1, the overhead over overhead is calculated (Level 2 and up ).
Base Type
The base type on which the overhead is calculated. The base type can be changed only if the base status is Draft.

Allowed values

Base Type.

Overhead Percentage
The overhead cost expressed as a percentage. The value in this field can be changed only if the base status is Draft.
Note

Overhead percentage is mandatory when Base Type is set to Amount.

Overhead Rate
The overhead amount per unit direct labor hour.
Note

The Overhead Rate field is enabled only if the Base Type is set to Direct Labor Hours.

Currency
The currency used to express the overhead rate.
Status
The status of the overhead application base.

Allowed values

Base Status.

Valid From
The start date when the overhead application base is effective.
Note

LN calculates overheads only if the transaction date is within the validity period of the overhead application base.

Up to and Including
The end date until which the overhead application base is effectiive.
Note
  • You can change the date only when the base status is set to Draft.
  • LN calculates overheads only if the transaction date is within the validity period of the overhead application base.
Target Cost Object
The code that identifies the cost object on which the overhead is calculated.
Note

The target cost object must be of cost type overhead.

Description
The description or name of the code.

 

Effective
Displays the overhead application bases with the status Active.
Ineffective
Displays the overhead application bases with the status Draft.
Closed
Displays the overhead application bases that are closed.
All
Displays all the overhead application bases.