To close a project

A project can be closed only after all the transactions related to the project are closed.

To close a project, in the Project Status (tppdm6107s000) session the Financial Result Status field is set to Determine Result.

Note

This field is enabled only if the status of the project is Finished.

Before closing the project, performs the following checks, specific to the project: