The order type of the orders for which the tools are being
planned.
Plan Tools Globally (titrp0211m000)Use this session to plan tools that are assigned to an order as estimated requirements in the Estimated Tool Requirements (titrp0111m000) session. Because LN only plans tools (tool type/ tool serial number combination), this session considers only tool types for which the tool serial number is not present.
Order Type The order type of the orders for which the tools are being
planned. Order The order number of the production order, the service order, or
the work order. Operation One of a series of steps in a routing that are carried out
successively to produce an item. The following data is collected during a routing operation:
This data is used to compute order lead times, to plan production orders and to calculate cost prices. Line Number The line number for which the tool is issued. This field is
only relevant for service orders and work orders. Activity Line The activity line for which the tool is issued. This field is
only relevant for refurbishing orders from Service. Line Number The line number for which the tool is issued. This field is
only relevant for service orders and work orders. Activity Line The activity line for which the tool is issued. This field is
only relevant for refurbishing orders from Service. Operation Step The operation step for which the tool is planned. This field is only applicable if the Order Type field in the current session is SFC Production Order. Operation Step The operation step for which the tool is planned. This field is only applicable if the Order Type field in the current session is SFC Production Order.
| |||