Print Material Shortages by Production Order (tisfc0419m000)

Use this session to check whether the material that is required for production orders is available in time.

Report

The report displays the following symbols:

*Indicates a material shortage.
!Indicates that the material availability depends on the execution of other orders. If those orders are delayed, a material shortage can occur.

 

 

Selection Range
SFC Order Group
If this check box is selected, you can specify a range of order groups.
SFC Order Group
A collection of planned production orders, which you can use as a selection criterion to transfer planned production orders from Enterprise Planning to the Shop Floor Control module of Manufacturing.

SFC can use the same collection of production orders to organize manufacturing tasks.

Production Order
An order to produce a specified quantity of an item on a specified delivery date.
Project
A collection of manufacturing and purchasing actions that are performed especially for a particular customer order. A project is initiated by a customer order for items having a To Order order policy. The purpose of a project is to plan and coordinate the production of these items.

For a standard-to-order production, the project is only used to link the item with the customer order. Otherwise, a project can include:

  • Customized item data (BOMs and routings)
  • Project planning (activity planning)

A budget is a special type of project. A budget is used to plan and estimate, not to carry out production.

Production Start Date and Time
The start date and time of the production order.
Planner
The employee or department responsible for planning the production, purchase and distribution of items. The planner takes into account the inventory levels, availability of materials, and capacities of resources, and reacts on signals such as rescheduling messages that LN generates.
Shop Floor Planner
The person responsible for printing, (re)scheduling and releasing production orders and managing workloads.
Options
Check
Determines what kind of check this session performs.

Allowed values

  • On Hand

    LN checks the inventory on hand.

    Scheduled receipts from purchase orders are ignored.

    Scheduled receipts from production orders are taken into account only in the following cases:

    • The production order has already been released.
    • The production order is contained in the selection ranges you specified under Selection Range.
  • Planned Available

    LN checks the projected available quantity, based on all planned inventory transactions, including scheduled receipts from all purchase orders and production orders. This check is not multilevel. That is, LN does not check whether materials supplied by other production orders are delayed because of material shortages for those production orders.

  • Multilevel
    LN checks the projected available quantity. If a material must be supplied by a production order, LN also checks whether the materials for that production order will be available in time. LN recursively checks the availability of lower-level materials. For more information, refer to Multilevel material shortage check.

Scope
Determines from which warehouses LN takes the available inventory into account.

Allowed values

  • Current Warehouse Only
    Take only the inventory in the warehouse of the material into account. The material's warehouse is displayed in the Warehouse field in the Bill of Material (tibom1110m000) session.
  • Planned Warehouses in Cluster
    Take the inventory into account in all warehouses in the same cluster as the material's warehouse. In general, nearby warehouses belong to the same cluster. However, LN excludes the warehouses for which the Include in Enterprise Planning check box in the Warehouses (tcmcs0503m000) session is cleared.
  • All Warehouses in Cluster
    Take the inventory into account in all warehouses in the same cluster as the material's warehouse, regardless of the setting of the Include in Enterprise Planning check box in the Warehouses (tcmcs0503m000) session.

If the Check field is Multilevel, this field is Planned Warehouses in Cluster and cannot be changed.

Skip Blocked Inventory
If this check box is selected, LN does not take the inventory that is blocked into account for analyzing the production orders' material supply. Inventory can be blocked for inspection or for other reasons. Select this check box if you expect the material quality to be poor.

If the Check field is Multilevel, this check box is automatically set the same as the Inspection Blocks Enterprise Planning check box in the Inventory Handling Parameters (whinh0100m000) session and cannot be changed.

Critical Items Only
If this check box is selected, LN checks only the materials for which the Critical for Inventory Check check box in the Items - Production (tiipd0101m000) session is selected.
Note

If you check multilevel, and a material that is not critical has lower-level materials that are critical, LN will check these lower-level materials.

Print
Select the type of orders to be printed.

Allowed values

  • All Orders
  • Orders with Shortage
  • Orders without Shortage

 

Print
Starts printing.