Effective Cost Component Structure by Assembly Line and Item (ticpr3162m000)

Use this session to display the effective cost component structure by assembly line and item. The effective cost component structure is a result of running the Actualize Assembly Line Costing Data (ticpr0215m000) session. In the Effective Date field the date is displayed on which the assembly line costing data is actualized.

The effective cost component structure contains the aggregated cost components that are defined for the assembly line's items in the Items - Costing (ticpr0107m000) session. If you entered a chart for an assembly line in the Assembly Line Costing Data (ticpr0115m000) session, the detailed cost components that were defined for the chart in the Chart Details (ticpr0110m000) session are included in the effective cost component structure.

 

Assembly Line
A set of consecutive line stations in which FAS (Final Assembly Schedule) items are manufactured. The items are manufactured by passing the items from line station to line station and by carrying out operations at each line station. An assembly line is subdivided into a number of line segments separated by buffers. An assembly line can be either a main line or a supplying line.
Item
The item for which the effective cost component structure is displayed.
Effective Date
The effective date, actualized in the Actualize Assembly Line Costing Data (ticpr0215m000) session.

 

Print Effective Cost Component Structure by Assembly Line and Item
Starts the Print Effective Cost Component Structure by Assembly Line and Item (ticpr0412m100) session.
Show Current Data
Displays only the cost components that are effective at the latest calculation date.
Show All Data
Displays all cost components, also the cost components that are not effective.