If this check box is selected, the effective dates of
the BOM lines are checked to determine whether the BOM line's components are
still valid and can be used in the manufactured item.
Update BOM Explosion Consistency (tibom1210m000)Use this session to update whether BOM lines are marked as Exploded by SCS Planner.
Check Effectivity against Date If this check box is selected, the effective dates of
the BOM lines are checked to determine whether the BOM line's components are
still valid and can be used in the manufactured item. Simulation Only If this check box is selected, the update of the
consistency of the BOM explosion is only simulated, and no actual changes are
made. This is useful when you just want to view the updates. A report is
printed, which presents the simulation results. Check Effectivity against Date The date on which the effectivity of the BOM lines is checked.
Update If this check box is selected, BOM texts that have been
recorded in the Generic BOMs (tipcf3110m000) session by component are printed.
| |||