Process BOM changes to Sales Order (tdsls4263m000)

Use this session to process engineering bill of material changes to sales orders that are not Closed. You can process BOM changes to sales order lines and/or sales order component lines.

This session can be started as follows:

  • From the Sales Orders (tdsls4100m000) and Sales Order - Lines (tdsls4100m900) sessions.
  • Stand-alone.

You can indicate whether the changes must be processed on sales order main item level or on sales order line item level.

Processing BOM changes can result into the following for open sales order (component) lines:

  • Terminate
    Terminate sales order (component) lines with items that are no longer present in the new BOM.
  • Terminate component lines for which enough is already delivered in the new situation.
  • Update
    Update sales order (component) lines with items that are still present in the new BOM. Only the ordered quantity can be updated; no logistical changes are processed. If the order line quantity has changed, linked component lines are also changed.
  • Create
    Create order lines and component lines for new main items.
  • Create component lines for newly added components.
  • Create component lines for component lines that are Canceled, Terminated, or Finalized. The already delivered quantity is taken into account.
Note
  • The new aggregated BOM structure from Manufacturing is used for processing the BOM changes to the sales orders.
  • When changes are processed, the surplus is updated for the sales order line.

 

Item Search Level
The level on which BOM changes are processed.

Allowed values

Item Search Level

Project
An endeavor with a specific objective to be met within the prescribed time and financial limitation, and that has been assigned for definition or execution.
Note

To create a peg for new order lines, specify a value in this field.

Element
The smallest part of an element structure. An element is used to define the (structure of the) work of the project, so that you can carry it out.
Note

To create a peg for new order lines, you can specify a value in this field.

Activity
The smallest part of the activity structure used for a time-scaled budget. An entity that is used to represent a part of a project in an activity structure.

LN distinguishes these activity types:

  • WBS Element
  • Control Account
  • Work Package
  • Planning Package
  • Milestone
Note

To create a peg for new order lines, you can specify a value in this field.

Simulate
If this check box is selected, a report simulating the processing of changes is displayed. The data update is only displayed, not processed.

The report contains information between the old and the new situation. The following is displayed:

  • Newly added order lines and component lines.
  • Terminated order lines and component lines.
  • Old and new values of changed quantities on both order line and component line level.
  • Information about the BOM structure.
  • IInformation about the main item.
Print Errors Only
If this check box is selected, an error report is printed if errors occur when processing the changes.
Ignore Warehouse from BOM
If this check box is selected, and a new sales order line is created due to a BOM change on sales order main item level, a warehouse is defaulted to the order line by using the standard warehouse defaulting logic for manually entering an order line.

Standard warehouse defaulting logic

  1. Product variant (only for Manufactured items with the default supply source set to Assembly in the Item - General (tcibd0101s000) session).
  2. Ship-to Business Partner.
  3. Item Sales Data.
  4. Sales Order Header.
  5. User Profile.
  6. Item Ordering Data.
  7. Sales Office.

If this check box is cleared, the Warehouse from the Bill of Material (tibom1110m000) session is defaulted to the newly created order line.

Note

This check box is only applicable for newly added sales order lines. Not for changed order lines or for component lines.

 

Specific Order(s)
Reset Selection
Click Reset Selection to make another data selection. The selection you entered is deleted and you can make a new selection.