Allowed values
Process BOM changes to Sales Order (tdsls4263m000)Use this session to process engineering bill of material changes to sales orders that are not Closed. You can process BOM changes to sales order lines and/or sales order component lines. This session can be started as follows:
You can indicate whether the changes must be processed on sales order main item level or on sales order line item level. Processing BOM changes can result into the following for open sales order (component) lines:
Note
Item Search Level The level on which BOM changes are processed. Allowed values Project An endeavor with a specific objective to be met within the
prescribed time and financial limitation, and that has been assigned for
definition or execution. Note To create a peg for new order lines, specify a value in this field. Element The smallest part of an element structure. An element is used
to define the (structure of the) work of the project, so that you can carry it
out. Note To create a peg for new order lines, you can specify a value in this field. Activity The smallest part of the activity structure used for a
time-scaled budget. An entity that is used to represent a part of a project in
an activity structure. LN distinguishes these activity types:
Note To create a peg for new order lines, you can specify a value in this field. Simulate If this check box is selected, a report simulating the
processing of changes is displayed. The data update is only displayed, not
processed. The report contains information between the old and the new situation. The following is displayed:
Print Errors Only If this check box is selected, an error report is
printed if errors occur when processing the changes. Ignore Warehouse from BOM If this check box is selected, and a new sales order
line is created due to a BOM change on sales order main item
level, a warehouse is defaulted to the order line by using the
standard warehouse defaulting logic for manually entering an order
line. Standard warehouse defaulting logic
If this check box is cleared, the Warehouse from the Bill of Material (tibom1110m000) session is defaulted to the newly created order line. Note This check box is only applicable for newly added sales order lines. Not for changed order lines or for component lines.
Specific Order(s) Starts the Enter Specific Sales Orders (tdsls4820s000) session. Reset Selection Click Reset Selection to make another data selection. The
selection you entered is deleted and you can make a new selection.
| |||