Sales Order Material Supply Lines (tdsls4116m000)

Use this session to view, enter, and maintain the material supply lines that are linked to a sales order line, which indicate all materials and subassemblies that are supplied by the manufacturer to you (the subcontractor).

Note

 

Sales Order
The sales order to which the material supply lines are linked.
Position
The number used to identify the position of the order line on the sales or purchase order.
Position
The number used to identify in detail the position number of a sales order (delivery) line or a purchase order line (detail).
Material Sequence
The number that identifies a data record or a step in a sequence of activities. Sequence numbers are used in many contexts. Usually LN generates the sequence number for the next item or step. Depending on the context, you can overwrite this number. You can sometimes influence the numbering by setting the corresponding parameters.
Item
The item that must be supplied to the subcontractor by the manufacturer.
Effectivity Unit
A reference number, for example a sales order line or a project deliverable line, that is used to model deviations for a unit effective item.
Required Quantity
The quantity of the material that is required for the subcontractor to produce the end item.
Required Quantity
The unit in which the Required Quantity is expressed.
Planned Receipt Date
The date on which the materials are planned to be received by the subcontrator.
Supply-to Warehouse
The warehouse to which the materials are supplied.
Note

The warehouse must be of the Normal, or Shop Floor type.

Supply Quantity
The quantity of the material that is supplied to the subcontractor, expressed in the supply unit.
Supply Unit
The unit in which the Supply Quantity is expressed.
Supply Order Number
The manufacturer's linked purchase order with which the materials are received from the manufacturer.
Note

Click Supply Order... on the appropriate menu to view the displayed purchase order number.

Operation Number
The operation for which the material is needed on the manufacturer's production order.
Task
The task for which the material is needed on the manufacturer's production order.
Task
The description of the task on the manufacturer's production order.
Operation Text
If this check box is selected, text that is linked to the operation is available.
Task Text
If this check box is selected, text that is linked to the task is available.

 

Supply Order...
Starts the Purchase Order - Lines (tdpur4100m900) session, in which you can view the manufacturer's linked purchase order with which the materials are supplied.
Item Inventory
Starts the Warehouse - Item Inventory (whwmd2515m000) session to view the inventory levels.