Purchase Request for Quotation Lines (tdpur1502m000)Use this session to view, enter, and maintain request for quotation (RFQ) lines. You can start this session as follows:
Note
Request for Quotation The number of the request for quotation (RFQ). Pos The position number of the request for quotation (RFQ) line. Default value LN calculates the default position number by using the value defined in the Step Size for RFQs field of the Request for Quotation Parameters (tdpur0100m100) session. Alt The request for quotation (RFQ) line's sequence number, which is
greater than one if it includes an item that can be an alternative for the
preferred item. You must manually specify alternatives in the Purchase Request for Quotation Lines (tdpur1502m000) session. Example The sequence numbers defined in the current field, represent the RFQ lines in the most suitable alternative sequence. So, sequence number one represents the first preferable item that can be an alternative for the originally preferred item, sequence number two represents the second item that can be an alternative, and so on. Status The status of the RFQ line. Allowed values Item Cross Reference The alternative way of communicating with the bidder about
items. Allowed values Code Item Type The item code system's code. The
item code system is used to search for an item in an alternative way, for
instance by the bidder's item code. Note You can specify this field only if the Item Cross Reference field is ICS. Cross Reference Item The item code that is used to indicate the item in the Item field. The Item Cross Reference field determines the item code that you can select.
Note The MPN must have the status Approved or For Approval on the RFQ Date. Item In LN,
the raw materials, subassemblies, finished products, and tools that can be
purchased, stored, manufactured, sold, and so on. An item can also represent a set of items handled as one kit, or exist in multiple product variants. You can also define nonphysical items, which are not held in inventory but can be used to post costs or to invoice services to customers. The following are examples of nonphysical items:
The item code can be blank, which means bids are requested for a new item. You can add a text to describe the item. When a response line that is linked to the RFQ line receives the Accepted status, the item code becomes mandatory. Note If the warehouse is WMS controlled:
Standard Description If this check box is selected, LN prints both the
standard item description and the specific request for quotation (RFQ) line
text. If this check box is cleared, LN prints only the specific request for quotation (RFQ) line text. Preferred MPN The preferred manufacturer part number (MPN) for the
item. Manufacturer Effectivity Unit Number A reference number, for example a sales order line or a project
deliverable line, that is used to model deviations for a unit effective item. Note If the warehouse is WMS controlled, and the Effectivity Units check box is cleared for the warehouse in the WMS Integration Parameters (whwmd2105m000) session, you cannot enter an effectivity unit in this field. Project The project to which the
item on the request for quotation (RFQ) line is related. Note If the RFQ line represents a customized item, the project in this field must be equal to the project as specified in the project segment of the Item field. You can also send an RFQ for standard items that are related to a specific project. In this case, you can specify a project in the current field. RFQ Quantity The quantity that must be delivered according to the terms on
the order line. The quantity is expressed in the purchase unit or the sales
unit of the item. Unit The purchase unit in
which the items on the request for quotation (RFQ) line are expressed. Estimated Price The target price that is desired for the item on this RFQ
line. Default value The Purchase Price from the Items - Purchase (tdipu0101m000) session. Currency A generally accepted medium of exchange such as coins, treasury
notes, and banknotes. The following currency types are available in LN:
Price Unit The item unit in which an item's purchase price is expressed.
This unit can differ from the item's inventory unit. Latest Purchase Price The purchase price that is displayed on the most recent invoice
received for the item on this RFQ line. Default value The Latest Purchase Price from the Items - Purchase (tdipu0101m000) session. Picture The item's picture, which is defaulted from the Picture field in the Item - General (tcibd0101s000) session. Warehouse The warehouse where the
items must be delivered. Default value LN retrieves the default warehouse from:
Receipt Address The address of the warehouse or place where the goods must be
delivered. Default value LN retrieves the default warehouse address from:
Note If you have defined a warehouse in the Warehouse field, you must fill this Receipt Address field. Receipt Date The date on which the items, for which you send the request for
quotation, are scheduled to be delivered. Note
Receipt Period The start date of the period that the items, for which you send
the request for quotation, are scheduled to be delivered. Default value LN retrieves the default start date from the Purchase Requests for Quotation (tdpur1501m000) session. Note The start date is copied to the purchase order, or purchase contract, when you copy the RFQ line in the Convert Quotations to Contracts/Orders/Price Books (tdpur1202m000) session. This happens after you accept the RFQ response from the bidder. You cannot define a receipt period if a receipt date is defined. Delivery Period The end date of the period that the items, for which you send
the request for quotation, are scheduled to be delivered. Default value LN retrieves the default end date from the Purchase Requests for Quotation (tdpur1501m000) session. Note The end date is copied to the purchase order or purchase contract when you copy the RFQ line in the Convert Quotations to Contracts/Orders/Price Books (tdpur1202m000) session. This happens after you accept the RFQ response from the bidder. You cannot define a delivery period if a delivery date is defined. Lead Time When you manually specify the request for quotation (RFQ), you
can define a lead time that will be used on the purchase order to determine the
delivery date. Delivery date = order date + lead time. Lead Time The unit in which the lead time is expressed. Line Text If this check box is selected, a text is present. Export License Required If this check box is selected, an export license is required for the item. Note This check box is only visible if the Export Licenses check box is selected in the Project Pegging Parameters (tcpeg0100m000) session. Peg Distribution If this check box is selected, a peg distribution is linked to this RFQ Line. Activity The smallest part of the activity structure used for a
time-scaled budget. An entity that is used to represent a part of a project in
an activity structure. LN distinguishes these activity types:
Element The smallest part of an element structure. An element is used
to define the (structure of the) work of the project, so that you can carry it
out. Extension The specific agreements within or in addition to the initial
contract. An extension falls outside the initial contract with the sold-to
business partner. Extensions can be assigned to the bottom-up
budget. LN distinguishes four extension types:
Cost Component A cost component is a user-defined category for the
classification of costs. Cost components have the following functions:
Cost components can be of the following cost types:
Note If you use Assembly Control (ASC), you cannot use cost components of the General Costs type. RFQ Origin The request for quotation (RFQ) line's origin. Example When you create the RFQ line in the Purchase Request for Quotation Lines (tdpur1502m000) session, the RFQ Origin is Manual. Allowed values
Linked RFQ Line Data Starts the Linked RFQ Data (tdpur1502s000) session. Peg Distribution Starts the Purchase Peg Distribution (tdpur5100m000) session in which you can view, enter, and
maintain the peg distribution details. Project Contract Information If the project has a linked contract, use this command to view the contract
information in the Contract (tpctm1600m000) session. Open RFQ lines Only displays the open RFQ lines, which means the RFQ line
status is not Processed.
| |||