Project Pegging Parameters (tcpeg0100m000)

Use this session to define parameters for project pegging.

 

Introduction Date
Description
The description of the parameter set.
General
Planning Group
Commingling Across Planning Groups Allowed
If this check box is selected, supply from project pegged items is possible across planning groups. If this check box is cleared, commingling of supply for project pegged items is restricted to the planning group.
Note

You can exclude one or more planning groups from commingling.

Default Planning Group
The planning group defined as the default for the project.

New (TP) projects are by default assigned to this planning group.

Export Control
Export Licenses
If this check box is selected, some of the project pegged items make use of items which require export licenses.
Restrict Commingling and Cost Peg Transfers
If this check box is selected, commingling and cost peg transfers are restricted.
DPAS Control
Use DPAS
If this check box is selected, you can use DPAS ratings, which can be defined and maintained in the DPAS (tcmcs0172m000) session.
Miscellaneous
Allow Commingling Exceptions
If this check box is selected, you can specify commingling exceptions in the Commingling Exceptions (tcpeg0102m000) session.
Note

Commingling exceptions can be specified only if this parameter is selected.

Use Identical Cost Pegs for Multi-Company Warehouse Transfers
If this check box is selected, the cost peg distributions of the receiving and supplying company will be identical.
Note

The Borrow/Loan and Payback check box must be selected to make use of this functionality.

Cost Peg Transfers
Excess Sequence
Standard Material
Priority 1
Select what type of inventory is to be used first to fulfil demand.
Priority 2
Select what type of inventory is to be used second to fulfil demand.
Priority 3
Select what type of inventory is to be used third to fulfil demand.
Ignore ATT Time Fence during Outbound
If this check box is selected, the time fence for the available to transfer is ignored during outbound advice for materials.

If this check box is selected, the available to transfer lead time is assumed to be zero, which means the warehouse outbound procedure can issue any item that is on hand in the warehouse and generate the required cost peg transfers.

Borrow/Loan and Payback
Borrow/Loan and Payback
If this check box is selected, temporary transfers of inventory between cost pegs are possible within the company. The transfer is triggered in case of urgent demand for which no inventory is available under the project cost peg with the demand.
Note

You can only select this check box if the Use Available to Transfer check box is selected in the Planning Parameters (cprpd0100m000) session.

Aging
If this check box is selected, temporary transfers are forced closed after a set period of time.

When the Aging Period has elapsed, the temporary transfer becomes permanent. As a result, the value of the materials is booked to the borrowing project.

Note

The loaning project does not get its materials replenished as Aging effects only the financial payback. This may result in shortages at a later stage.

The Aging process is controlled at company level with the time periods set for all items and projects simultaneously.

Period
Specify the period after which temporary transfers are closed and become permanent transfers.

Allowed values

  • Days
  • Weeks
  • Months
  • Not Applicable
Log Borrow/Loan Transactions in Project
If this check box is selected, borrow/loan transactions are logged in the Financial Transactions (tpppc2100m100) session.
Ignore Cost Peg Transfer Rules for Payback
If this check box is selected, cost peg transfer rules for payback as set in the Cost Peg Transfer Rules (tcpeg1100m000) are ignored in the selected project.

 

Print Common Parameters