Landed costs – setup

To set up landed costs:

  1. In the Implemented Software Components (tccom0500m000) session, on the Concepts (Logistics) tab, ensure that the Landed Costs check box is selected.
  2. In the Landed Cost Types (tclct0110m000) session, specify landed cost types.
  3. In the Landed Costs (tclct1115m000) session, specify landed costs.
  4. In the Landed Costs Classifications (tclct0120m000) session, specify landed costs classifications.
  5. In the Landed Costs Sets (tclct1100m000) session, specify landed costs sets.
  6. In the Landed Costs Set - Scenarios (tclct1105m000) session, specify landed costs scenarios.