Project historyIn Project, you can post budgets, costs, and revenues to history. Posting costs and revenues to history is mandatory; posting budgets to history is optional. If you do not want to keep track of the changes in budget lines, turn off this option to limit database growth; to do so, use the Log History of Budget check box in the PTC Parameters (tpptc0100s000) session. Note that if the history is not logged, you cannot select the Net Change Run check box in the Generate Control Data (tpptc1230m000) session. Performance aspects
| |||