Manual blocking of pegsNew in Infor LN 10.2.1 In Infor LN 10.2.1, a new level of blocking quantities has been introduced, LN generates blockings on peg level when the item is Project Pegged. To determine the pegs to be blocked, do the following:
For more information, refer to Generate NCMR for blocked stockpoints.
| |||