Plan Items - Optimized Lot Sizes (cprao3110m000)Use this session to view the optimized lot sizes and order intervals that LN calculated in the Optimize Lot Sizing (cprao3200m000) session.
Scenario The scenario for which LN displays the optimized
lot sizes and order intervals. Plan Item The plan item for which LN displays the optimized
lot sizes and order intervals. Order Interval The optimized order interval for the
specified plan item. The order interval is expressed in calendar days. Use the Copy Lot Sizes to Item Ordering Data option from the appropriate menu to copy the optimized order interval to the Order Interval field in the Items - Ordering (tcibd2500m000) session. Lot Size The optimized lot size for the specified
item Select the Copy Lot Sizes to Item Ordering Data option from the appropriate menu to copy the lot size to the Economic Order Quantity field in the Items - Ordering (tcibd2500m000) session. Old Lot Size The lot size before optimization. Resource The resource for which the item
parameters are optimized. If the routing of an item contains multiple resources, this field displays the resource with the highest priority. Computed Cost The cost associated with this parameter setting. Note This is the cost over the total time period for which the logistic parameters have been optimized. Cost Advantage The difference between the cost of the optimized lot size and
the cost of the currently effective lot size. The currently effective lot size is defined in the Items - Ordering (tcibd2500m000) session. This field indicates the cost advantage that can be realized if you copy the optimized parameters to the Item Base Data module. Note The cost is calculated for the total time period over which the logistic parameters were optimized. Copy If this check box is selected, you can copy the
optimized values to the actual order parameters, if you select Copy Lot Sizes