Costing Breaks Service Depot Repair Other (tppdm3105m000)

Use this session to create and maintain the costing breaks for other depot repair costs for the service of an item.

For a project involving depot repair of Service item, you can create costing breaks for other costs for service of the item. You can create costing breaks for the depot repair service labor costs of the type tooling, subcontracting and other by the item group and the item, mapped to specific element or activity of the project.

Note

To manually copy the costing breaks to another project, select the Copy to other Project option on the Actions menu. The Copy to Other Project window opens wherein you can specify the target project code.

Related topics

 

Project
The code that identifies the project for which the costing breaks are created.
Note

You can also create costing breaks for blank projects (projects for which the project code is not specified). However, you must specify the standard element/activity to create the costing breaks.

Line
The line number of the costing break.
Cost Type
The service cost type for which the costing breaks are created.

Allowed values

Following are the applicable cost types:

  • Tooling
  • Subcontracting
  • Other
Item Group
The specific item group by which the costing break is created.
Note

This field is enabled if the Cost Type field is set to Subcontracting or Other.

Item
The specific item for which the costing break is created.
Note

This field is disabled if you specify a value in the Item Group field.

Tool Serial
The tool serial number of the item for which the costing break is created.
Note

This field is enabled only if the Cost Type field is set to Tooling and a value is specified in the Item field.

Element
The element for which the costing break is created.
Note

You must specify a standard element and/or a standard activity for a blank project.

Description
The description or name of the code.
Activity
The activity for which the costing break is created.
Note

You must specify a standard element and/or a standard activity for a blank project.

Description
The description or name of the code.

 

Import Item Groups
Imports all existing item groups.
Copy to other Project
Copies the selected costing break to another project.