You can also create costing breaks for blank projects (projects for which the project code is not specified). However, you must specify the standard element/activity to create the costing breaks.
Costing Breaks Service Depot Repair Other (tppdm3105m000)Use this session to create and maintain the costing breaks for other depot repair costs for the service of an item. For a project involving depot repair of Service item, you can create costing breaks for other costs for service of the item. You can create costing breaks for the depot repair service labor costs of the type tooling, subcontracting and other by the item group and the item, mapped to specific element or activity of the project. Note To manually copy the costing breaks to another project, select the Copy to other Project option on the Actions menu. The Copy to Other Project window opens wherein you can specify the target project code.
Project The code that identifies the project for which the costing breaks are
created. Note You can also create costing breaks for blank projects (projects for which the project code is not specified). However, you must specify the standard element/activity to create the costing breaks. Line The line number of the costing break. Cost Type The service cost type for which the costing breaks are created. Allowed values Following are the applicable cost types:
Item Group The specific item group by which the costing break is created. Note This field is enabled if the Cost Type field is set to Subcontracting or Other. Item The specific item for which the costing break is created. Note This field is disabled if you specify a value in the Item Group field. Tool Serial The tool serial number of the item for which the
costing break is created. Note This field is enabled only if the Cost Type field is set to Tooling and a value is specified in the Item field. Element The element for which the costing break is
created. Note You must specify a standard element and/or a standard activity for a blank project. Description The description or name of the code. Activity The activity for which the costing break is
created. Note You must specify a standard element and/or a standard activity for a blank project. Description The description or name of the code.
Import Item Groups Imports all existing item groups. Copy to other Project Copies the selected costing break to another
project.
| |||