Subtotals by Primary Structure Element

The total amount by PSE is calculated based on the Leading Estimate Type (LET) and the Cost / Sales Level of the PSE.

The following situations can be distinguished:

  • Estimating Type = Bottom Up:

    • LET = Bottom Up / Cost/Sales Level = Detail

      The total by PSE is the sum of all estimate lines of this PSE with Estimate Level = Bottom Up and Estimate Level = Detail.

    • LET = Bottom Up / Cost/Sales Level = Total

      The total by PSE is the estimate line of this PSE with Estimate Level = Bottom Up and Estimate Level = Total

  • Estimating Type = Top Down:

    • LET = Top Down

      The total by PSE is always the estimate line of this PSE with Estimate Level = Top Down and Estimate Level = Total. The Cost/Sales level does not make any difference.