OpenWorld Server Manager (tmboaserver)The user must start the default back-end component in the OpenWorld Adapter Configuration and keep the component running in the back end LN server to work with the integration. You can start the component from the OpenWorld server starter UI & command (tmboaserver ) session. The user can run this session in either Free mode or in Check-User mode. If the user runs this session in the check-user mode, the user must provide valid LN user login details. Without this information, the data from LN will not be fetched. Click LN Login Details. The following window appears in which the user can provide the
required information. When the tmboaserver (OpenWorldX Server Manager) runs in
Free mode, these details need not be provided. After the user starts the
component, the company number is automatically picked from the
BusComponent. ![]() If the LN server is present on Windows NT for the check user authentication, the user must enable the LN Login protocol. To enable this protocol, take the following steps:
| |||