| Sequencing Assembly OrdersGenerating a sequence of assembly orders per
line station is a mandatory step in the procedure, even if you do not intend to
use the sequencing engine. The assembly orders on each line must have the
status Sequenced before you can
continue with the process. The sequencing process starts from the roll-off
line. The sequencing engine sequences assembly lines individually, starting
from the roll-off line and progressing backwards. For the supplying line, we
must re-run the sequence engine . The following are the sequencing options that are available in
the Simulate and Create Line Sequences (tiasl4200m000) session: Local Improvement If this check box is selected,, LN optimizes the sequence for the segment selected
in the Pivot Segment field. You can select the Neighbor Checking check box to optimize the sequence
for a segment. Neighbor Checking If this check box is selected,, LN takes account of the segments immediately before
and after the specified segments during the optimization process. This action
gives rise to a sequence that is translatable to the neighbor segments, which
means that the sequence changes are feasible. You can select this check box
only if the Local Improvement check box is selected. If the Global Improvement check box is selected, LN automatically
selects the current check box. Global Improvement If this check box is selected,, LN optimizes the sequence for all the segments that
you select in this session.
Define the sequence selection
criteria. Click Generate and check if error messages are logged. If
required, troubleshoot the messages. If you want to first evaluate generated
sequences, do not select the Confirm Sequence option but first evaluate your run.
Select your run number from the Sequence Quality group box, and click Evaluate. LN displays the sequence of the assembly orders on
different line segments through a report. Click Confirm to confirm the run
number. LN saves the generated sequence, which you can view, per line segment, in the Line Segment - Line Sequence (tiasl4500m000) session. Verify that the generated sequence
is saved. Repeat steps 2 and 3 for sequencing your
supplying line. Open the Assembly Orders (tiasc2502m000) session and check if your assembly orders have the Sequenced status. Verify
that the related line station orders are still in the Planned status. Open the Assembly Orders (tiasc2502m000) session and verify the following: - The assembly orders with the Sequenced status have a
serial number.
- LN generates an As-Built header.
| |