Reprocessing Production OrdersYou can only use this session for production orders whose status is:
If the Regenerate for Net-Change SFC Items Only check box is selected, material requirements are recalculated for items with changes to their BOM or routing. In that case, the Net Change SFC check box in the Items - Production (tiipd0101m000) details session is selected. Only the orders and operations for those items are replanned. If all production orders of the item are reprocessed correctly, the Net Change SFC check box in the Items - Production (tiipd0101m000) details session is cleared. When you run this session, the order status changes to Planned. All the manual changes that you have made (for example, in the Production Planning (tisfc0110m000) session) are undone. Note If a production order distribution plan is present for a production order, this distribution (including the operation distribution and the material distribution) is deleted during reprocessing. The distribution is not created again.
| |||