| Maintaining Routing OperationsFor a nonstandard routing Enter the code of an operation and a manufactured
item For a standard routing only select the routing Choose the first operation number and the associated
task The other data is then displayed as default data. This data
is retrieved from the Tasks (tirou0103m000) session, or
the Task Relationships (tirou0104m000) session. - You can enter and maintain a routing operation directly in the Routing Operations (tirou1102m000) overview session.
- To change more details, you must double-click the BOM line,
after which the Routing Operations (tirou1102m000) details session
starts.
To change the number of resources on an
operation If you want to change the number of resources on
an operation, you can do this by changing the value of the Man Occupation for Production field, or the Machine Occupation field. However, changing the
number of resources does not effect the cycle time, and, consequently, the production time. On
the other hand, the total production costs will change due to the extra
resources. To prevent that production costs change when you
change the man occupation or the machine occupation, the cycle time must be
recalculated. You can choose to do so, because when changing the man or machine
occupation, a question pops up to ask you whether you want the cycle time to be
recalculated: - If you click Yes, the cycle time is recalculated. So, the man
occupation or machine occupation is changed, including the total production
time, but the costs stay the same. For more information on how the cycle time
is recalculated, refer to Recalculation of cycle time when changing man occupation or machine occupation.
- If you click No, the changed man occupation or machine
occupation does not affect the cycle time and the production time. However, the
total production costs will change to reflect the change in man occupation or
machine occupation.
| |