| Including/Excluding E-ItemsWhether the items listed in this session are excluded items or
included items depends on the Include/Exclude E-Items field in the MBC (tiedm3110m000) details session or the MBC Action (tiedm3120m000) details session. If the value of the Include/Exclude E-Items field is Include, the items in this
session are included. If the value of the field is Exclude, the items in this
session are excluded. Whether the E-items for an order have been set to be
included or excluded is displayed in the Include/Exclude E-Items field in the Include/Exclude E-Items (tiedm3121m000) session. In the MBC (tiedm3110m000) session you must define whether the list of
included/excluded E-items in this session is valid for every MBC action
seperately, or for the MBC as a whole: - If the Include/Exclude E-Items per Action check box in the MBC (tiedm3110m000) details session is selected, you specify for every
action seperately which items are effected by the action. To do so, select the
appropriate action in the MBC Action (tiedm3120m000) session, and start the Include/Exclude E-Items (tiedm3121m000) session from the appropriate menu. Now you
can define the items that are affected by the action. You must use the Inc./Exc. E-Items field in the MBC Action (tiedm3120m000) details session to determine whether the action
includes or excludes the E-item.
- If the Include/Exclude E-Items per Action check box in the MBC (tiedm3110m000) session is cleared, you specify a set of items for
which all actions linked to the MBC are valid. To do so, select the appropriate
MBC in the MBC (tiedm3110m000) session, and start the Include/Exclude E-Items (tiedm3121m000) session from the appropriate menu. Now you
can define the items that are affected by the actions linked to the MBC. All
actions that you define for the MBC apply to that set of items. You must use
the Include/Exclude E-Items field in the MBC (tiedm3110m000) session to determine whether e-items must be included
or excluded.
Example In the MBC Action (tiedm3120m000) session you state that LN must replace the
component Red-Wheel with the component Blue-Wheel. You can use the Include/Exclude E-Items (tiedm3121m000) session to ensure that not all the Red-Wheels
are replaced, but only those that are components of the E-item Blue-Bicycle. - Run the Print Where-Used Components (tiedm1450m000) session to find out in which E-items the
Red-Wheel is used.
- Enter the parent E-item (Blue-Bicycle) that you want to
include in the Include/Exclude E-Items (tiedm3121m000) session.
- Set the Include/Exclude E-Items check box in the MBC (tiedm3110m000) session to Include.
When you finalize the MBC, LN replaces all the
Red-Wheels with Blue-Wheels, but only in the Blue-Bicycle. If you want to replace Red-Wheels in many parent
items: - Select Exclude in the Include/Exclude E-Items field in the MBC (tiedm3110m000) session.
- Enter the parent items that you do not want to include for changing in the Include/Exclude E-Items (tiedm3121m000) session.
Tip If you are not sure of the effects of the options you have
chosen, you can simulate the effect of the MBC in the MBC (tiedm3110m000) session. | |