Effective Assembly Line Surcharge Base (ticpr3160m000)Use this session to display the effective assembly line surcharge base for a specific assembly line. You can view the effective assembly line surcharge base in this session, after you actualized the assembly line surcharges in the Actualize Assembly Line Surcharges (ticpr2280m000) session. An assembly line surcharge base is a set of cost components based on which the assembly line surcharge must be calculated. You must use an assembly line surcharge base if the surcharge calculation method for the assembly line surcharge is Selective (Total Costs), or Selective (Added Costs). The surcharge calculation method is defined in the Assembly Line Surcharges (ticpr1180m000) details session.
Assembly Line A set of consecutive line stations in which FAS (Final Assembly
Schedule) items are manufactured. The items are manufactured by passing the
items from line station to line station and by carrying out operations at each
line station. An assembly line is subdivided into a number of line segments
separated by buffers. An assembly line can be either a main line or a supplying
line. Generic Item The generic item or manufactured item for which the Default Supply Source is Assembly. Effective Date The date and time on which the assembly line surcharges take
effect. Sequence The sequence number of the
assembly surcharge line. Cost Component The cost component to which the assembly line surcharge is
linked.
| |||